Çerkezköy WWTP Project

About the Project

Capacity
To serve a population of 230,000 with a capacity of 52,800 m3/day.

Process
The Çerkezköy plant applying advanced biological treatment processes is intended to remove pollutants such as carbon, nitrogen and phosphorus.

Objective
Tekirdağ Çerkezköy Wastewater Treatment Plant is intended to discharge domestic wastewater from Çerkezköy, Kapaklı, Karaağaç, Kızılpınar, and Veliköy municipalities of Tekirdağ province into the environment in accordance with international standards, using advanced biological and mechanical treatment methods, after the removal of pollutants such as carbon, nitrogen, and phosphorus as well as physical pollutants. To save Ergene River and thus the Marmara Sea from pollution together with other treatment plants commissioned in the surrounding districts.

Districts
To treat all the wastewater from Çerkezköy, Kapaklı, Karaağaç, Kızılpınar, and Veliköy regions until the removal of nitrogen, carbon, and phosphorus.

Project scope

Project analysis, construction, commissioning, and operation of the turnkey Treatment Plant including construction for 1 year.

Scada and Automation Architecture;

1. Scada System-1: Process Scada
2. Scada System-2: Energy Scada
3. Reporting System: Process and Energy System Reporting
4. Scada Data Point: 20.000 Tags
5. Server Structure: 2 Set Redundancy Server
6. Operator PC / Workstations: 2 Set Client PC
7. Field Local Monitoring System: 3 Sets of 7 ”HMI Panel
8. Central Controller Structure: Set Redundancy DCS
9. Distributed Controller Structure: 19 PLCs
10. Communication Infrastructure: Fiber / Ethernet Ring Structure

CUSTOMER

ÇERKEZKÖY MUNICIPALITY

}

DATE

JAN 14, 2017

CATEGORY

SCADA

SYSTEMS

ABB PLC