Çerkezköy WWTP Project About the Project Capacity To serve a population of 230,000 with a capacity of 52,800 m3/day. Process The Çerkezköy plant applying advanced biological treatment processes is intended to remove pollutants such as carbon, nitrogen and phosphorus. Objective Tekirdağ Çerkezköy Wastewater Treatment Plant is intended to discharge domestic wastewater from Çerkezköy, Kapaklı, Karaağaç, Kızılpınar, and Veliköy municipalities of Tekirdağ province into the environment in accordance with international standards, using advanced biological and mechanical treatment methods, after the removal of pollutants such as carbon, nitrogen, and phosphorus as well as physical pollutants. To save Ergene River and thus the Marmara Sea from pollution together with other treatment plants commissioned in the surrounding districts. Districts To treat all the wastewater from Çerkezköy, Kapaklı, Karaağaç, Kızılpınar, and Veliköy regions until the removal of nitrogen, carbon, and phosphorus. Project scope Project analysis, construction, commissioning, and operation of the turnkey Treatment Plant including construction for 1 year. Scada and Automation Architecture; 1. Scada System-1: Process Scada2. Scada System-2: Energy Scada3. Reporting System: Process and Energy System Reporting4. Scada Data Point: 20.000 Tags5. Server Structure: 2 Set Redundancy Server6. Operator PC / Workstations: 2 Set Client PC7. Field Local Monitoring System: 3 Sets of 7 ”HMI Panel8. Central Controller Structure: Set Redundancy DCS9. Distributed Controller Structure: 19 PLCs10. Communication Infrastructure: Fiber / Ethernet Ring Structure CUSTOMER ÇERKEZKÖY MUNICIPALITY } DATE JAN 14, 2017 CATEGORY SCADA SYSTEMS ABB PLC ← Next Project Other Projects All Projects Çerkezköy WWTP ProjectApril 6, 2018 Batıçim SCADA and Reporting SystemMarch 8, 2018 MKE Capsule Plant SCADA SystemMarch 8, 2018 Bodrum Airport Scada and Load Shedding SystemOctober 31, 2017